Tuesday, 8 March 2016

Update

Wigan Council will be undertaking footway resurfacing works from Culcross Avenue to Pemberton Road (even side only)  between Monday 7 March 2016 and Friday 18 March 2016.

To undertake these works safely temporary traffic signals will be in operation at off peak hours.

The highway grass verges near Hope Children’s Centre on Highfield Grange Avenue have been churned up as a result of the recent heavy rainfall and inappropriate parking. Following a site inspection an order has now been issued to repair the vehicle over ride damage. To prevent further damage bollards are to be installed along this verge.

We have written to all the vehicle contractors that drop off children at the school requesting they refrain from driving over the verges in future.

No comments:

Post a comment